Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » DIY - Forum

DIY - Forum Do It Yourself for Non-Fishing Items

Reply
 
Thread Tools Rate Thread Display Modes
Old 12-14-2020, 06:41 PM   #1
spence
Registered User
iTrader: (0)
 
spence's Avatar
 
Join Date: Nov 2003
Location: RI
Posts: 21,496
Quote:
Originally Posted by nightfighter View Post
This is why I hate these TV shows that have to have a remodel done in a week, or some other outrageous time frame. I have had to tell clients that this is not a half hour TV show.... Sometimes the universe just speaks to us and says; Not happening today! Be it the heat, the moisture, the flooring that has to acclimate....or a sub that doesn't show or want to play ball.... it is an inexact science.

Or shipping! I just got my special order email on December 2 for the decking I need to finish the last 17 inches of my deck. Except they sent me more square edge and I want the grooved to continue. They still billed me for grooved and longer lengths I ordered, a 26% overcharge for the wrong order!!!! It's just been a special year....
Wait, you don’t have a 3D printer to mock up all your projects?
Posted from my iPhone/Mobile device
spence is online now   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:43 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com