Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » DIY - Forum

DIY - Forum Do It Yourself for Non-Fishing Items

Reply
 
Thread Tools Rate Thread Display Modes
Old 09-30-2016, 06:15 AM   #1
Rmarsh
Registered User
 
Join Date: Jan 2006
Posts: 1,974
Preparing the volute and newel post. There is a lot to getting the post height and rake angle correct. It is satisfying when all the calculations and layout work come together. The starting newel has a 1 1/2" dowel that extends down through the tread and riser to the floor. There are different ways to fasten it. This time I will lag bolt into the bottom of the newel post dowel from the basement.

Last edited by Rmarsh; 08-26-2023 at 05:56 AM..
Rmarsh is offline   Reply With Quote
Old 10-01-2016, 08:37 AM   #2
trevier
Registered User
 
Join Date: Nov 2008
Posts: 333
nice work as always. I'm finishing up a 28 wide by 30 ft deep garage. I've done 99% percent of the work myself. Had 2 guys come in and help me with the trusses and plywood on the roof, the rest I've done myself.
trevier is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 01:39 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com