Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home Register FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » DIY - Forum

DIY - Forum Do It Yourself for Non-Fishing Items

Reply
 
Thread Tools Rate Thread Display Modes
Old 06-20-2020, 09:13 AM   #1
piemma
Very Grumpy bay man
iTrader: (0)
 
piemma's Avatar
 
Join Date: Nov 2003
Location: Rhode Island
Posts: 10,546
Blog Entries: 2
Quote:
Originally Posted by Rmarsh View Post
AEven had customers tell me my price was too high...then call me when they've been shafted by the lowballer.

Same with tree work Bob. Quoted a job and the guy laughed at me. Said he got a price 1/2 mine. The Asshats dropped the tree on the guys garage and had NO insurance. Guys call me back and wanted me to clean up the mess. Told him I was too busy.

No boat, back in the suds.
piemma is online now   Reply With Quote
Old 06-21-2020, 07:10 AM   #2
Rmarsh
Registered User
 
Join Date: Jan 2006
Posts: 1,698
Quote:
Originally Posted by piemma View Post
Same with tree work Bob. Quoted a job and the guy laughed at me. Said he got a price 1/2 mine. The Asshats dropped the tree on the guys garage and had NO insurance. Guys call me back and wanted me to clean up the mess. Told him I was too busy.

Paul....It was quite a few years ago, I remember working diligently on the estimate, it was for a family room and large attached garage, big enough for the guys RV... total package ...everything included. I never gave prices on square footage....always a total breakdown of every aspect/cost start to finish. When we met to look over my proposal, the guy says "wow thats the price? I'll call you when I hit the lottery"
Waste of my time for sure....was a few weeks later, one evening around 10pm I get a phone call....woman was sobbing....something about the guy they hired ripping them off, and wanting me to consider renegotiating. Told her there was nothing I could do for them.

I love my trade.... never even thought about any other line of work, but dealing with customers...I dont miss that at all.
Rmarsh is offline   Reply With Quote
Old 06-24-2020, 05:13 AM   #3
Rmarsh
Registered User
 
Join Date: Jan 2006
Posts: 1,698
We sub out the hardwood install.....sure they're fast ....but the morons install every piece in the carton, including many pieces with defects...cracks, splits, checking etc....so they blame the manufacturer. We could have them come back and replace all the bad ones....we just dont want it to look worse when they're done....which it will....so I do it. Tedious job ...but hey I got the AC cranking ...

Last edited by Rmarsh; 08-26-2023 at 06:06 AM..
Rmarsh is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 02:15 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com