Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 09-13-2012, 05:42 PM   #12
pbadad
Registered User
iTrader: (0)
 
pbadad's Avatar
 
Join Date: Dec 2002
Location: North Branford,Ct.
Posts: 7,666
The dupe set up laterally is fairly easy. Line up the cutting tip in a lock position and check the line up on the drive point and tail stock point. Vertical adjustment is cutting bit tip slightly under frontdrive and rear tailstock tip. Directions have a complete set up instruction and setting up template. good Luck. PS the collars are the bomb. Let me get a picture up soon.

Billy D.
pbadad is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 02:05 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com