99% sure the 620 cannot take the 1KW transducer.
It has a 600W max.
The 585 can use 1KW.
~..~..~.. ><((((º>
Things done at the last possible minute are done with the greatest possible information. Procrastination is, therefore, the most efficient means of doing things.