Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Search Today's Posts Mark Forums Read Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Main Forum » StriperTalk!

StriperTalk! All things Striper

Reply
 
Thread Tools Display Modes
Old 05-28-2004, 06:12 PM   #1
TheSpecialist
Hardcore Equipment Tester
iTrader: (0)
 
TheSpecialist's Avatar
 
Join Date: Mar 2001
Location: Abington, MA
Posts: 6,234
Blog Entries: 1
I built a rack last year for my Expedition. I got a 10' length of 2" schedule 40 pipe,enough couplers for the schedule 40 for the number of tubes you want, a piece of Kindorf bracket, and the clamps to hold the pipes on. Cut the pipe to length, glue on a coupling. Then with a saw, or dremel notch the top of the coupling. Attatch the coupling to the kindorf bracket with the clamps, and attatch it to the liscence plate bracket. I also bought some flat bar, and used some clamps from work to add an additional stabilizer. You can get the pipe , couplers, and Kindorf bracket and clamps at an elctrical supply.

Bent Rods and Screaming Reels!

Spot NAZI
TheSpecialist is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:46 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com