Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 01-17-2009, 06:53 AM   #9
scottw
Registered User
iTrader: (0)
 
scottw's Avatar
 
Join Date: Nov 2007
Posts: 12,632
yes, just skip the scratch coat I should have just gone with that...hey, I am curious though ...since this is the topic....when you guys have problems with "that clear coat between the paint and finish epoxy"..is it a problem getting the epoxy to lay out well on the plug an over a scratch coat or is it an issue later discovered with poor adhesion and peeling?just curious, I realize that there are a whole host of things that can go wrong....

thanks Prof. I think it was one of your posts that sent me off to the System3 data sheets, it actually vastly improved the finished product that I've been putting out in my own business and eliminated a lot of problems that were dogging me for years....now I need to investigate "UPOL"
scottw is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:39 PM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com