Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Build Stuff: Custom Plug & Lure Building, Rod Building » Plug Building - Got Wood?

Plug Building - Got Wood? Got Plug?

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 04-22-2016, 07:20 AM   #14
stripermaineiac
Registered User
 
Join Date: Jul 2004
Location: Buxton, Maine
Posts: 1,727
1 of the most important things with explosion proof is that the power source be outside of the contaminated air flow. The venturie set up must have the air flow away from the power set up. If the air is all coming from the same enviornment the more powerful suction will also draw contaminated fumes into the air being used to pull from the spraybooth as the secondary draw will be under less pressure. one of the best set ups I;ve seen was a body shop had the primary airflow pumped from outside with the pick up pulling from the spraybooth on the way by. No cross contamination. Just remember that static electricity is a huge problem with any air movement so you need to ground the system very well. Static is a problem with dust collection.
stripermaineiac is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:54 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com