Striper Talk Striped Bass Fishing, Surfcasting, Boating

     

Left Nav S-B Home FAQ Members List S-B on Facebook Arcade WEAX Tides Buoys Calendar Today's Posts Right Nav

Left Container Right Container
 

Go Back   Striper Talk Striped Bass Fishing, Surfcasting, Boating » Striper Chat - Discuss stuff other than fishing ~ The Scuppers and Political talk » DIY - Forum

DIY - Forum Do It Yourself for Non-Fishing Items

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old 07-27-2013, 12:40 PM   #8
spence
Registered User
iTrader: (0)
 
spence's Avatar
 
Join Date: Nov 2003
Location: RI
Posts: 21,481
Quote:
Originally Posted by BigFish View Post
Oh there was never a question is I was going to do it or not......I don't "F" with electrical! Just a matter of the proper way to do this.
I would think the proper way would be for an electrician to pull the hanger and meter off and temporarily affix to something else while you replace the boards. I'd think they may want to disconnect the service line that runs to the house but the rest could probably be left intact. This assumes it's already good to go and up to code. If somebody thinks you've mucked with it after the fact it would be a good idea to make it right.

I'm guessing though, I've only replaced one service and my assistant was a master electrician

Call an elec and get an estimate and advice.

-spence
spence is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 02:33 AM.


Powered by vBulletin. Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Please use all necessary and proper safety precautions. STAY SAFE Striper Talk Forums
Copyright 1998-20012 Striped-Bass.com