transom is in, just needs fairing and gel coat, new Douglass fir keel stringer has been installed, fully encased in fiberglass and epoxy, sole has been raised 4" by adding Douglass fir risers( fully encased in epoxy and fiberglass) rear splash well was molded and bonded to the transom with thickened epoxy, wire chases have been run as has plumbing for the bait well and wash down pump, a below deck battery area has been created as has a mid ship anchor locker, box stringers have been foamed in, trimmed flush and sealed with epoxy, then a veil of 2 layers of 1.5 ounce mat put over the top to seal the "box" I'l prepare the plas-core deck this week and start the install next weekend.
|